The fixed grid operator costs for electricity in the Netherlands per grid operator and connection, per month and per year incl. VAT, with the components excl. VAT. These are the maximum tariffs the ACM sets in its tarievenbesluiten; a grid operator may charge less. The sum per connection is vastrecht transportdienst, the capaciteitstarief, the periodieke aansluitvergoeding and the meettarief. They are the same with every energy supplier. A standard household has a 3 x 25 A connection. Credit the ACM when you publish these figures. A year that is missing is not published yet. Any personal token may read it.

GET
/grid-operator-costs
AuthorizationBearer <token>

API token from the Joulo dashboard, or an OAuth2 access token.

In: header

Query Parameters

grid_operator?string

Leave it out for all grid operators.

Value in"Coteq" | "Enexis" | "Liander" | "Rendo" | "Stedin" | "Westland Infra"
year?integer

Leave it out for every published year.

Range2026 <= value

Response Body

curl -X GET "https://api.joulo.nl/functions/v1/api/grid-operator-costs?grid_operator=Coteq&year=2026"
{
  "source": "ACM, tarievenbesluiten regionale netbeheerders elektriciteit (maximumtarieven)",
  "unit": "EUR incl. VAT",
  "notes": [
    "These are the maximum tariffs the ACM sets. A grid operator may charge less."
  ],
  "requested_year": 2026,
  "years": [
    {
      "year": 2026,
      "grid_operators": {
        "Liander": [
          {
            "connection": "3 x 25 A",
            "monthly_eur_incl_vat": 39.84,
            "yearly_eur_incl_vat": 478.08,
            "components_eur_per_year_excl_vat": {
              "vastrecht": 17.9945,
              "capacity": 297.84,
              "connection_fee": 41.172,
              "meter": 38.11
            },
            "source_url": "https://www.acm.nl/system/files/documents/tarievenblad-liander-elektriciteit-2026.xlsx"
          }
        ]
      }
    }
  ]
}
{
  "error": "invalid_grid_operator",
  "detail": "grid_operator must be one of: Coteq, Enexis, Liander, Rendo, Stedin, Westland Infra."
}
{
  "error": "Missing or invalid API token"
}